Drilling operations can be interrupted by the malfunction of equipment and systems, or the lack of competence of drilling personnel. Aside from the safety implications, these interruptions result in Non-Productive Time (NPT), which is costly.
Our complimentary guide identifies seven ways to reduce non-productive time of your land rig, helping you:
- Improve maintenance management of your land rig
- Reduce operating and inspection costs by up to 50%
- Reduce failures
- Mitigate against unnecessary downtime
- Ensure your rig is fit for purpose
- Identify drilling operational and safety critical equipment
- Improve crew competency
- Improve safety